Road Safety India Indian Roads Traffic

Go Back   Easy Drive Forum - www.easydriveforum.com > Road Safety in India > Indian Cities > Bangalore

Bangalore
The garden city, set dosa, the largest population Kannada speaking Tamils, Malleshwaram, MG, Kemp Fort, Software, no water, pubs, Vidhan Soudha, Vivesvaraya, spanking clean, sweet, relaxed, greatest weather. Techies who know the right rules to flirt. Silicon valley of India. But how MNCs, outsourcing and corporate culture is shaping the infrastructure of the city?

Reply
 
Thread Tools Rating: Thread Rating: 3 votes, 5.00 average. Display Modes
Old 29-03-07, 09:23 AM   #1
manoj
Easy Drive Forum Veteran
 
manoj's Avatar
 
Join Date: Aug 2006
Posts: 355
Breathe easy, new projects are here

Breathe easy, new projects are here

Left carriageway of the underpass at Ramamurthynagar on Outer Ring Road, widened road between HAL corporate office to Kundalahalli junction and the left carriageway of the road over-bridge at Marathahalli will be thrown open for traffic on Friday(30Mar'07). Chief minister H D Kumaraswamy will inaugurate the projects.

After opening the left carriageway, the BDA will take up work on the right carriageway. Similarly, the right carriageway work of Marathahalli over-bridge will commence after Friday.

The road from HAL to Kundalahalli cross is 5.13 km and at Marathahalli, Bangalore-Salem railway line crosses this road with a road overbridge. This road also gives connectivity to Airport from Electronic City and Whitefield. As such, the existing carriageway, which is undivided at some stretches, is not sufficient to cater even to the present day traffic. Hence the BDA decided to take up its widening at a cost of Rs 6.33 crore. It is now a 4-lane divided carriageway where pavements have been strengthened, parking space created on both sides of the road in Marathahalli limits, lane marking, road traffic signs and road furniture have been put.

The existing road over-bridge accommodates two-lane traffic of Airport Road and it was decided to build a new over-bridge with six-lane carriageway. Railways are implementing the project as a deposit contribution work.

The Ramamurthynagar underpass is a three-lane bi-directional carriageway and this is being implemented at a cost of Rs 17.46 crore.

Source: http://epaper.timesofindia.com (Bangalore Edition)
Date Of Publish: 29-Mar-07
__________________
Nothing is fool-proof to a talented fool.
manoj is offline   Reply With Quote
Reply

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Traffic Easy seminar puyal Chennai 0 22-03-08 06:51 PM
Licence to drive, and kill, comes easy manoj Mumbai 0 08-12-06 09:14 AM
Hi Easy Drive Forum sameer New Member Introductions 0 21-09-06 02:13 PM
Traffic police frown on ‘myopic’ projects pawan Kolkata 0 20-09-06 10:00 AM
Welcome to Easy Drive Forum ravikant Announcements 0 20-09-06 09:49 AM


All times are GMT +5.5. The time now is 07:50 AM.


Home | About EDF | Disclaimer | Contact Us
Copyright © 2012, www.easydriveforum.com, All Rights Reserved.
Bookmark and Share
Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.
Content Relevant URLs by YABBSEO 1.0